Copyright © coloradoskihistory.com All Rights Reserved.
Pictures thanks to Quintin C. and Brad C.
|
* The PHB-Hall Gondola (Removed 2012):
* Area Overview:
* Lift #1 (CTEC):
* Lift #2 - Lincoln (Riblet, Removed 2012):
* Lift #3 (Garaventa CTEC):
* Lift #4 - Captain (Riblet, Removed 2012):
* Lift #5 (Riblet):
* Lift #6 (Riblet):
* Lift #7 (CTEC):
N/A
* Lift #8 (CTEC):
* Construction for the new Doppelmayr Gondola:
The mountain after the 2012 fires
The lift construction staging area in the parking lot, summer 2012
Reconstruction of the Lincoln lift with a new Doppelmayr Triple
Reconstruction of the Captain lift with a new Doppelmayr Quad
|